Premium Ryan Vargas Canada Summer Critical Path Security 2025 Unisex T-shirt, Sweatshirt, Hoodie, Long Sleeve Tee
Wearable Art — Vivid DTG Print on Genuine Gildan®
That feeling when someone stops you and says ‘yo, where’d you get that?’ — that’s what this is. Premium Gildan® cotton, DTG-printed so the colors hit different and never fade. Your new go-to, trust us.
📸 Image shows a tee, but this design is printed on 4 styles: T-Shirt, Long Sleeve, Sweatshirt & Hoodie. Select your preferred style at checkout — every piece is made to order, exactly how you pick it.
What Makes It Hit Different
- 🎨 Fade-Proof Color — Direct-to-garment printing means your design stays as bold as the day it arrived.
- 🧵 Premium Feel — Genuine Gildan® blanks. Ultra Cotton for tees, Heavy Blend for hoodies. You’ll feel the difference.
- 👕 Fits Like It Should — Classic cut, taped neck & shoulders, tear-away label. Nothing scratchy, nothing awkward.
- 🇺🇸 Good Cotton, Good Vibes — US Cotton Trust Protocol member. Sustainable, premium, American-grown.
Fabric & Construction
- T-Shirt & Long Sleeve: 100% cotton (5.3–6 oz) — lightweight, breathable.
- Sweatshirt & Hoodie: 50/50 cotton/polyester (8 oz) — warm, pill-resistant, rib with spandex.
- Note: Sport Grey contains a 90/10 cotton/poly blend for color consistency.
Pick Your Color & Size
Find your size and pick your color — it’s that easy:
Available Colors
Gildan 5000 — Unisex T-Shirt
| Size | Length | Bust |
|---|---|---|
| S | 28 in (71.1 cm) | 36 in (91.4 cm) |
| M | 29 in (73.7 cm) | 40 in (101.6 cm) |
| L | 30 in (76.2 cm) | 44 in (111.8 cm) |
| XL | 31 in (78.7 cm) | 48 in (121.9 cm) |
| 2XL | 32 in (81.3 cm) | 52 in (132.1 cm) |
| 3XL | 33 in (83.8 cm) | 56 in (142.2 cm) |
| 4XL | 34 in (86.4 cm) | 60 in (152.4 cm) |
Gildan 18000 — Unisex Sweatshirt
| Size | Length | Bust | Sleeve |
|---|---|---|---|
| S | 27 in (68.6 cm) | 40 in (101.6 cm) | 33.5 in (85.09 cm) |
| M | 28 in (71.1 cm) | 44 in (111.8 cm) | 34.5 in (87.63 cm) |
| L | 29 in (73.7 cm) | 48 in (121.9 cm) | 35.5 in (90.17 cm) |
| XL | 30 in (76.2 cm) | 52 in (132.1 cm) | 36.5 in (92.71 cm) |
| 2XL | 31 in (78.7 cm) | 56 in (142.2 cm) | 37.5 in (95.25 cm) |
| 3XL | 32 in (81.3 cm) | 60 in (152.4 cm) | 38.5 in (97.79 cm) |
| 4XL | 33 in (83.8 cm) | 64 in (162.6 cm) | 39.5 in (100.33 cm) |
Gildan 18500 — Unisex Hoodie
| Size | Length | Bust |
|---|---|---|
| S | 27 in (68.6 cm) | 40 in (101.6 cm) |
| M | 28 in (71.1 cm) | 44 in (111.8 cm) |
| L | 29 in (73.7 cm) | 48 in (121.9 cm) |
| XL | 30 in (76.2 cm) | 52 in (132.1 cm) |
| 2XL | 31 in (78.7 cm) | 56 in (142.2 cm) |
| 3XL | 32 in (81.3 cm) | 60 in (152.4 cm) |
| 4XL | 33 in (83.8 cm) | 64 in (162.6 cm) |
Gildan 2400 — Unisex Long Sleeve Tee
| Size | Length | Bust | Sleeve |
|---|---|---|---|
| S | 27.95 in (71 cm) | 36.22 in (92 cm) | 33.46 in (85 cm) |
| M | 29.13 in (74 cm) | 40.16 in (102 cm) | 35.04 in (89 cm) |
| L | 29.92 in (76 cm) | 44.09 in (112 cm) | 36.61 in (93 cm) |
| XL | 31.1 in (79 cm) | 48.03 in (122 cm) | 38.19 in (97 cm) |
| 2XL | 31.89 in (81 cm) | 51.97 in (132 cm) | 39.37 in (100 cm) |
| 3XL | 33.07 in (84 cm) | 55.91 in (142 cm) | 39.37 in (100 cm) |
| 4XL | 33.86 in (86 cm) | 59.84 in (152 cm) | 38.98 in (99 cm) |
Tap a style above to view its chart. Measured laid flat.
- Browse colors and compare with the chart.
- Use the size guide for the best fit.
- Add to cart and you’re all set!
Shipping Details
- ✅ Made in: 1–3 business days.
- 📦 US Shipping: 3–7 business days.
- ⚡ Rush Delivery: 3–5 business days.
- 🌍 Worldwide: 1–2 weeks.
Every item is made to order just for you. Please verify your size using the chart above. We can’t accept returns for sizing errors, but we’re always here to help if something isn’t right.
🛒 Find your next favorite at happypodtees.com. Style, comfort, quality — guaranteed.